Boloco Biodiverse Reforestation.

Carbon Projects Co. Pty. Ltd.

Vegetation Environmental Asset Account.

Environmental Account ID: AU00075
Account Holder: Carbon Projects Co. Pty. Ltd
Purpose: Facilitate restoration in association with carbon projects and enabling participation in ecosystem service markets
Current land use:
Grazing
Environmental Asset: Vegetation - Native
Environmental Asset Account ID: AU00075V1
Registration date: 05 September 2024
Baseline Certification date: 10 August 2026
Certification pathway: AfN-Verified
Accredited Expert/s: Lucy Healing
Asset Account area: 1,245.8 ha (78.5% of property area)
Method:
AfN-METHOD-V-07

Environmental Asset Account snapshot.

Environmental Asset Account Econd® summary.

Environmental Asset Account statement.

Significant outcomes.

The extensive clearing of native woody vegetation across 85% of the account asset contributed to low indicator scores for tree stem density, tree cover, shrub cover, and tree and shrub species richness. However, these low ICSs were partially offset by a high configuration score, which reflects the asset’s proximity to a large remnant patch in the western portion of Boloco (not currently included in the asset), as well as nearby vegetated corridors linking to Nature Reserves and Kosciuszko National Park to the southeast and southwest. Planned environmental plantings of local native tree and shrub species are expected to enhance ecological condition over time, offering strong potential for future improvement in the Econd® score. The next assessment is scheduled for around 2028.

Limitations & disclosures.

Seasonal timing - Sampling was undertaken during winter due to the need to undertake the baseline survey prior to scheduled planting. The timing of the survey had the potential to reduce the detection of herbaceous species through lack of flowering parts and reduce the detection of annual species that die off during winter. Over a significant extent of the asset, the high cover of pasture grasses recorded was likely to inhibit the growth and cover of native herbaceous species. The timing of the survey is unlikely to skew the ICSs for herbaceous species richness or native herbaceous cover to a degree that would greatly change the baseline Econd®.

Environmental planting preparation - A number of paddocks had received herbicide treatment and some tilling of the soil in preparation for environmental planting, where the occasional dead native grass species were observed. The condition of several sample sites in these assessment units (2a and 3a) were likely slightly higher quality prior to the site planting preparation occurring. It is unlikely however, to have significantly impacted the baseline Econd®.

Survey intensity - Ground-truthing of the assessment unit mapping during the field data collection revealed some errors in the SVTM and SVTM PC (including wrong PCT or not remnant). This resulted in the need for additional survey locations to be selected during the field survey. One assessment unit (3d) was under-sampled and is two short of the required survey intensity, stemming from the ground-truthing of sub-asset mapping. This will be rectified during the next field survey campaign. For all other assessment units, the number of sample sites satisfies the Method’s Very High (95%) Accuracy Level.